Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Catch-basin construction in Edmonton, Alta
Practice followed in building catch basins and manholes; standard manhole of concrete block construction and 20 in. catch basin of tiles with side inlet described and illustrated; details of modified catch basin for steep grades.
Catch-basin construction in Edmonton, Alta
Practice followed in building catch basins and manholes; standard manhole of concrete block construction and 20 in. catch basin of tiles with side inlet described and illustrated; details of modified catch basin for steep grades.
Catch-basin construction in Edmonton, Alta
Mun Utilities
Nielsen, E.W. (Autor:in)
Municipal Utilities ; 88
1950
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Low level bridges at Edmonton, Alta
Engineering Index Backfile | 1914
|Economical catch basin construction
Engineering Index Backfile | 1928
|Catch-basin and inlet construction
Engineering Index Backfile | 1928
Catch basin construction and maintenance
Engineering Index Backfile | 1917
Catch-basin construction and maintenance
Engineering Index Backfile | 1917