Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Old asphalt surface is heated and scraped to remove and scarify it; new hot material is then brought in by truck, hand spread and rolled, and street opened, usually within 3 hr.
Old asphalt surface is heated and scraped to remove and scarify it; new hot material is then brought in by truck, hand spread and rolled, and street opened, usually within 3 hr.
New York's asphalt resurfacing practice
Pub Works
Levy, H.W. (Autor:in)
Public Works ; 82
1951
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Sealing cracked asphalt for resurfacing
Engineering Index Backfile | 1932
|Resurfacing asphalt pavements in New York
Engineering Index Backfile | 1920
Resurfacing with natural sandstone rock asphalt
Engineering Index Backfile | 1939
|Incorporating RAP into airport asphalt resurfacing
TIBKAT | 2019
|