Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction of balancing reservoir
Reinforced concrete water reservoir of 400,000 gal serves population of 6000 in Aberdeen County; consumption averages 300,000 gpd, including domestic consumption of two large factories; data on walls, footings, floor, roof, inlet and outlet piping; composition of concrete used. (See also - discussion p 341-2)
Design and construction of balancing reservoir
Reinforced concrete water reservoir of 400,000 gal serves population of 6000 in Aberdeen County; consumption averages 300,000 gpd, including domestic consumption of two large factories; data on walls, footings, floor, roof, inlet and outlet piping; composition of concrete used. (See also - discussion p 341-2)
Design and construction of balancing reservoir
Instn Mun Engrs -- J
Nelson, H.A. (Autor:in)
1950
16 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
|Wiley | 1923
|Selset reservoir -- Design and construction
Engineering Index Backfile | 1962
|Reservoir Dobromierz - design, construction, exploitation
British Library Conference Proceedings | 1994
|Design and construction of Carron Reservoir
Engineering Index Backfile | 1939
|