Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Port of Boston enlarges master plan
Continuation of execution and enlargement of $19,700,000 " Master Plan" for construction and pier rehabilitation in Boston harbor; construction of East Boston Pier No. 1 deferred until completion of Mystic Pier No. 1; wide aprons, sizeable cargo ports, better lighting and column and truss clearance contribute to reduction of ship-turn-around time; development of Northern Avenue waterfront planned.
Port of Boston enlarges master plan
Continuation of execution and enlargement of $19,700,000 " Master Plan" for construction and pier rehabilitation in Boston harbor; construction of East Boston Pier No. 1 deferred until completion of Mystic Pier No. 1; wide aprons, sizeable cargo ports, better lighting and column and truss clearance contribute to reduction of ship-turn-around time; development of Northern Avenue waterfront planned.
Port of Boston enlarges master plan
Naut Gaz
Bresnahan, J.M. (Autor:in)
Nautical Gazette ; 145
1951
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
UK government enlarges OSO role
Online Contents | 1994
Kansas City enlarges its bus system
Engineering Index Backfile | 1935
Master highway plan for metropolitan Boston
Engineering Index Backfile | 1948
|San Francisco enlarges its airport
Engineering Index Backfile | 1948
Port of Suva, Master Development Plan
British Library Conference Proceedings | 1997
|