Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pioneer submarine gas line project completed
Illustrated description of construction of 8 5/8 in. OD 6.44 mi line with 50,000,000 cu ft daily capacity laid out in Gulf of Mexico at Vermillion parish, La, completed by Marine Gathering Co of Houston; use of special jetting device for digging trench; cathodic protection.
Pioneer submarine gas line project completed
Illustrated description of construction of 8 5/8 in. OD 6.44 mi line with 50,000,000 cu ft daily capacity laid out in Gulf of Mexico at Vermillion parish, La, completed by Marine Gathering Co of Houston; use of special jetting device for digging trench; cathodic protection.
Pioneer submarine gas line project completed
Gas Age
Grant, W.C. (Autor:in)
Gas Age ; 107
1951
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2001
Engineering Index Backfile | 1941
|Baker river power project completed
Engineering Index Backfile | 1925
|Mbashe North project nearly completed
British Library Online Contents | 2008
$7,000,000 power project completed in Kentucky
Engineering Index Backfile | 1926
|