Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sinking methods and costs at Burgin Shaft, Bear Creek mining co., east tintic project, Utah County, Utah
Sinking 3-compartment vertical shaft 1100 ft; operation featured Cryderman positive action and clam-type shaft mucker; shaft was completed in 142 days by shaft crew of 10 men and top force of 10 men, including supervision.
Sinking methods and costs at Burgin Shaft, Bear Creek mining co., east tintic project, Utah County, Utah
Sinking 3-compartment vertical shaft 1100 ft; operation featured Cryderman positive action and clam-type shaft mucker; shaft was completed in 142 days by shaft crew of 10 men and top force of 10 men, including supervision.
Sinking methods and costs at Burgin Shaft, Bear Creek mining co., east tintic project, Utah County, Utah
US Bur Mines -- Information Cir
Everett, F.D. (Autor:in)
1959
26 pages
Report
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Mining methods and costs at Tintic standard mine, Tintic district, Utah
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1899
|Deer creek dam, Provo river project, Utah
Engineering Index Backfile | 1939
|Mining-costs at Park City, Utah
Engineering Index Backfile | 1911
The Bear River Irrigation Canal, Utah
Engineering Index Backfile | 1891
|