Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Major measures used for Buffalo Creek flood prevention during past 10 yr; rock revetment has been principal type, with other measures including embankment and excavated bench methods, stabilization of toe rock with grouted steel bars, use of concrete toe blocks, and grade control sills; creek is about 50 mi long, drains 437 sq mi, including 21 sq mi in City of Buffalo where it drains into Lake Erie; diagrams.
Major measures used for Buffalo Creek flood prevention during past 10 yr; rock revetment has been principal type, with other measures including embankment and excavated bench methods, stabilization of toe rock with grouted steel bars, use of concrete toe blocks, and grade control sills; creek is about 50 mi long, drains 437 sq mi, including 21 sq mi in City of Buffalo where it drains into Lake Erie; diagrams.
Streambank stabilization
Agric Eng
Silberberger, L.F. (Autor:in)
1959
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Protecting Infrastructure: Emergency Streambank Stabilization
British Library Conference Proceedings | 2009
|Scour Analysis for Streambank Stabilization
British Library Conference Proceedings | 2015
|SCOUR ANALYSIS FOR STREAMBANK STABILIZATION
British Library Conference Proceedings | 2016
|The WES Stream Investigation and Streambank Stabilization Handbook
British Library Conference Proceedings | 1998
|