Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
36-in Water main crossing under tidal creek
Crossing of waterway by large water supply main invariably entails special problems, but, when that waterway is tidal and time allowed for closing it is limited to one tide, difficulties are greatly increased; such was obstacle to be overcome in laying of 36 in. diam steel main with which author was connected.
36-in Water main crossing under tidal creek
Crossing of waterway by large water supply main invariably entails special problems, but, when that waterway is tidal and time allowed for closing it is limited to one tide, difficulties are greatly increased; such was obstacle to be overcome in laying of 36 in. diam steel main with which author was connected.
36-in Water main crossing under tidal creek
Instn Water Engrs -- Trans
1942
16 pages
1 Supp map
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Siphon under Riachuelo creek for crossing of third main sewer of city of Buenos Aires
Engineering Index Backfile | 1943
|Economical Construction of a Creek Crossing
Wiley | 1919
|Chelsea Creek tunnel for Boston water main
Engineering Index Backfile | 1915
|Sewer Crossing of Creek with Bridge Widening
British Library Conference Proceedings | 1996
|Shallow Creek Crossing—Wye Bother? Split It!
ASCE | 2021
|