Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods used in removing 160 miles of steel rails from Seattle Streets
How contractors are ripping 80-lb rails from heavily traveled thoroughfares with minimum interference of traffic; method is rapid and low in cost; damage to pavement is unusually light; description of frame rail puller.
Methods used in removing 160 miles of steel rails from Seattle Streets
How contractors are ripping 80-lb rails from heavily traveled thoroughfares with minimum interference of traffic; method is rapid and low in cost; damage to pavement is unusually light; description of frame rail puller.
Methods used in removing 160 miles of steel rails from Seattle Streets
Pac Bldr Engrs
Edwards, H.H. (Autor:in)
1943
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Lighting 1000 miles of city streets
Engineering Index Backfile | 1926
|Sydney brings rails back to city streets
British Library Online Contents | 1997
De-spiking rails at ten miles an hour
Engineering Index Backfile | 1931
|Steps ahead: Making streets that work in Seattle, Washington
Online Contents | 1996
|Steps Ahead - Making Streets that Work in Seattle, Washington
British Library Conference Proceedings | 1995
|