Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Atlantic wire company completes annealing expansion
Installation of last annealing unit completed in new building and also installation of nitrogen generating apparatus; department handles carbon ranges and alloys for bright annealing and decarburization control; charge size of original equipment is 48 in. in diam, with piling height of 84 in.; additional furnaces 62 in. in diam, with 84-in. piling height; furnaces accommodate three stems of 22-in. wire, or five stems of 16-in. wire.
Atlantic wire company completes annealing expansion
Installation of last annealing unit completed in new building and also installation of nitrogen generating apparatus; department handles carbon ranges and alloys for bright annealing and decarburization control; charge size of original equipment is 48 in. in diam, with piling height of 84 in.; additional furnaces 62 in. in diam, with 84-in. piling height; furnaces accommodate three stems of 22-in. wire, or five stems of 16-in. wire.
Atlantic wire company completes annealing expansion
Wire Wire Products
1943
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2005
Superior company completes new clinker storage
Engineering Index Backfile | 1923
|Amitech completes Sao Paulo expansion
British Library Online Contents | 2008
Mountain Fuel Gas Completes Expansion, Replacements
Online Contents | 1993
Rio Tinto completes Kitimat aluminum smelter expansion
Online Contents | 2015