Construction procedure for excavating and lining Los Angeles Burbank-Western flood control channel, as carried out by Matich and Yeager, Calif, is described; 2500 ft length of 24-in. steel pipe was salvaged from some forgotten utility nearby, and by draining channel into this pipe by means of small dams, river was bypassed and carried around contemplated construction; concrete pouring operations.
Construction procedure for excavating and lining Los Angeles Burbank-Western flood control channel, as carried out by Matich and Yeager, Calif, is described; 2500 ft length of 24-in. steel pipe was salvaged from some forgotten utility nearby, and by draining channel into this pipe by means of small dams, river was bypassed and carried around contemplated construction; concrete pouring operations.
Constructing flood control channel
Excavating Engr
Bixby, F.S. (Autor:in)
Excavating Engineer ; 37
1943
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
METHOD FOR CONSTRUCTING BEAM CHANNEL BENEATH A FLOOD PROTECTION PLATE
Europäisches Patentamt | 2024
|Hurry-up flood control channel
Engineering Index Backfile | 1957
|Paved channel for flood control
Engineering Index Backfile | 1939
Quantitative drainage flood control channel structure
Europäisches Patentamt | 2023
|