Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Navy camp built from non-critical materials
Substituting asbestos cement sheets of 1/4 in. thickness for 5/8 in. thick plywood originally specified for exterior sheathing, contractors for Navy's Camp Bainbridge, Md, were able to eliminate more critical wood; thin asbestos sheets over plaster board and tar paper provide attractive, fireproof wall; glued, laminated arches form ribs for 120-ft span drill hall.
Navy camp built from non-critical materials
Substituting asbestos cement sheets of 1/4 in. thickness for 5/8 in. thick plywood originally specified for exterior sheathing, contractors for Navy's Camp Bainbridge, Md, were able to eliminate more critical wood; thin asbestos sheets over plaster board and tar paper provide attractive, fireproof wall; glued, laminated arches form ribs for 120-ft span drill hall.
Navy camp built from non-critical materials
Eng News-Rec
Engineering News-Record ; 130
1943
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1942
Navy-built aqueduct for San Diego
Engineering Index Backfile | 1947
Navy-built aqueduct for San Diego
Engineering Index Backfile | 1947
Bremerton navy yard pier built of precast concrete
Engineering Index Backfile | 1924
|Wood-frame tent camp built to shelter 20,000 men
Engineering Index Backfile | 1941