Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Description of two-pinned arch rib bridge of 47-ft 6-in. span constructed by two sub-sections of Field Company as training exercise in improvised bridging; time taken was 18 hr.
Description of two-pinned arch rib bridge of 47-ft 6-in. span constructed by two sub-sections of Field Company as training exercise in improvised bridging; time taken was 18 hr.
Improvised bridge
Roy Engrs J
Cockerton, A.E. (Autor:in)
1942
2 pages
Supp sheet
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Improvised ventilating machinery
Engineering Index Backfile | 1903
|Wiley | 1946
|Wiley | 1962
|Improvised cities: architecture, urbanization and innovation in Peru
Taylor & Francis Verlag | 2020
|MEETING THE THREAT OF MARITIME IMPROVISED EXPLOSIVE DEVICES
British Library Online Contents | 2009
|