Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Raise long bridge under traffic to clear flood waters
Description of unusual procedure followed in jacking up 1800-ft truss and girder structure of 9 spans, including one 267-ft span, which were menaced by high water.
Raise long bridge under traffic to clear flood waters
Description of unusual procedure followed in jacking up 1800-ft truss and girder structure of 9 spans, including one 267-ft span, which were menaced by high water.
Raise long bridge under traffic to clear flood waters
Ry Age
Railway Age ; 114
1943
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New refrigerated warehouse built on "stilts" to raise it above flood waters
Engineering Index Backfile | 1953
Bristol clear - Flood relief tunnel under Bristol
Online Contents | 2009
|Bootstrap jacking rigs raise bridge
Engineering Index Backfile | 1943