Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge deck paved with pumped concrete on plywood forms
Delivery of concrete to deck forms from pump on ground facilitated roadway paving on girder spans of 1450 ft west approach for new highway bridge across Mississippi River at Dubuque, Iowa; set up at 3 separate locations, pump delivered concrete through 6-in. pipe up to 300 ft long, with as much as 50 ft of vertical rise, at rates of 18 to 20 cu yd per hr.
Bridge deck paved with pumped concrete on plywood forms
Delivery of concrete to deck forms from pump on ground facilitated roadway paving on girder spans of 1450 ft west approach for new highway bridge across Mississippi River at Dubuque, Iowa; set up at 3 separate locations, pump delivered concrete through 6-in. pipe up to 300 ft long, with as much as 50 ft of vertical rise, at rates of 18 to 20 cu yd per hr.
Bridge deck paved with pumped concrete on plywood forms
Construction Methods
Construction Methods ; 25
1943
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
First orthotropic bridge deck paved with epoxy asphalt
Engineering Index Backfile | 1968
|Europäisches Patentamt | 2015
|French concrete road paved without side forms
Engineering Index Backfile | 1963
Use structural plywood forms on Illinois river bridge
Engineering Index Backfile | 1932
Concrete bridge deck stresses induced by stay-in-place forms
Online Contents | 2014
|