Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Magazine separation determines plan of ordnance depot
Engineering and construction work on ordnance depot which involved 3,500,000 cu yd of excavation and grading, 205,000 cu yd of concrete, 340,000 sq yd of chert surfacing of roads, 812,000 cu yd of backfilling over igloos, and 125 mi of roads; construction of igloo magazines described.
Magazine separation determines plan of ordnance depot
Engineering and construction work on ordnance depot which involved 3,500,000 cu yd of excavation and grading, 205,000 cu yd of concrete, 340,000 sq yd of chert surfacing of roads, 812,000 cu yd of backfilling over igloos, and 125 mi of roads; construction of igloo magazines described.
Magazine separation determines plan of ordnance depot
Civ Eng (NY)
Polk, A.C. (Autor:in)
1943
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Ordnance depot uses rock salt to help free roads of snow
Engineering Index Backfile | 1944
Emerald Group Publishing | 1998
Ordnance Survey copyright licence
Emerald Group Publishing | 2003
Sniffing Out Underwater Ordnance
ASCE | 2025
|