Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction of new 1100-ft span suspension bridge for road traffic over River Tamar between Plymouth and Saltash, England; reference is made to aerodynamic considerations, use of concrete towers, tunnel anchorages, use of prefabricated locked coil wire ropes for main cables and suspenders, details of stiffening truss and principal features of erection of this structure which was constructed in 2 yr and 3 mo.
Design and construction of new 1100-ft span suspension bridge for road traffic over River Tamar between Plymouth and Saltash, England; reference is made to aerodynamic considerations, use of concrete towers, tunnel anchorages, use of prefabricated locked coil wire ropes for main cables and suspenders, details of stiffening truss and principal features of erection of this structure which was constructed in 2 yr and 3 mo.
Tamar bridge
Instn Civ Engrs -- Proc
Anderson, J.K. (Autor:in)
1965
24 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1996
Online Contents | 1996
British Library Online Contents | 2002
|Engineering Index Backfile | 1961
Engineering Index Backfile | 1961