Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Effect of bridge deck on bridge project
For economical reasons and for rational and smooth execution of all building operations, choice of deck construction and materials must be made prior to submitting bridge project; speeds of modern vehicles demand highly plane deck surface; however, only limited accuracy of bridge substructure is possible for economical reasons, and substructure tolerances are much higher than those requested by deck builder; consequences of this discrepancy must be drawn, therefore, already at beginning stage of bridge design.
Effect of bridge deck on bridge project
For economical reasons and for rational and smooth execution of all building operations, choice of deck construction and materials must be made prior to submitting bridge project; speeds of modern vehicles demand highly plane deck surface; however, only limited accuracy of bridge substructure is possible for economical reasons, and substructure tolerances are much higher than those requested by deck builder; consequences of this discrepancy must be drawn, therefore, already at beginning stage of bridge design.
Effect of bridge deck on bridge project
Der Einfluss des Belages auf die Brueckenprojektierung
Baenziger, D.J. (Autor:in)
1965
13 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction method of bridge deck slab, bridge deck slab and bridge
Europäisches Patentamt | 2022
|Bridge deck replacement with lightweight exodermic bridge deck panels
British Library Conference Proceedings | 2000
|CONSTRUCTION METHOD OF BRIDGE DECK SLAB ASSEMBLY FOR BRIDGE DECK SLAB AND BRIDGE DECK SLAB
Europäisches Patentamt | 2018
|