Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction procedure and methods on the Alouette-Stave Tunnel
Contracting organization employed in driving a power tunnel, 3485 ft. long, for British Columbia Elec. Ry. Co.; quantities, rate of progress and cost.
Construction procedure and methods on the Alouette-Stave Tunnel
Contracting organization employed in driving a power tunnel, 3485 ft. long, for British Columbia Elec. Ry. Co.; quantities, rate of progress and cost.
Construction procedure and methods on the Alouette-Stave Tunnel
Contract Rec
Wing, S.P. (Autor:in) / Gilbert, J. (Autor:in)
1925
24 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Alouette-Stave lake hydro development
Engineering Index Backfile | 1925
|Construction methods on Alouette dam
Engineering Index Backfile | 1926
Online Contents | 1994
Construction of wood-stave pipe
Engineering Index Backfile | 1923
|Alouette dam spillway rehabilitation
British Library Conference Proceedings | 1993
|