Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Missouri Pacific replaces 47 bridges with enbankments
Total of 3,400,000 cu. yd. of filling used to eliminate 3.8 miles of timber trestle on White River division.
Missouri Pacific replaces 47 bridges with enbankments
Total of 3,400,000 cu. yd. of filling used to eliminate 3.8 miles of timber trestle on White River division.
Missouri Pacific replaces 47 bridges with enbankments
Ry. Eng. Maintenance
1925
3 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Missouri Pacific railway bridges
Engineering Index Backfile | 1891
B. and O. replaces bridges of historic interest
Engineering Index Backfile | 1924
|Wyoming replaces concrete bridges across platte river at Torrington
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1889
Missouri Pacific signal installation
Engineering Index Backfile | 1918
|