Renewing foundation under steam plant with station in service
Work, which required cutting off of about 2500 piles and replacing them with 625 concrete structures, was done with plant in regular operation; each of concrete columns replaced 14 ft. at top of four wood piles.
Renewing foundation under steam plant with station in service
Work, which required cutting off of about 2500 piles and replacing them with 625 concrete structures, was done with plant in regular operation; each of concrete columns replaced 14 ft. at top of four wood piles.
Renewing foundation under steam plant with station in service
Power
Power ; 61
1925