Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Description of excavating operations at 2 of 5 dams in North America's largest power project, with installed capacity of 4,280,000 hp on Manicougan, and 1,850,000 hp on Aux Outardes rivers in Quebec, Canada; No. 5 dam marks first use of concrete multiple arch design in Americas, with series of cone-shaped vaults making up structure 705 ft high at river line and 4200 ft long along crest; No. 2 dam is concrete gravity structure rising 300 ft above river bed, 2258 ft along crest, and featuring unique hollow design.
Description of excavating operations at 2 of 5 dams in North America's largest power project, with installed capacity of 4,280,000 hp on Manicougan, and 1,850,000 hp on Aux Outardes rivers in Quebec, Canada; No. 5 dam marks first use of concrete multiple arch design in Americas, with series of cone-shaped vaults making up structure 705 ft high at river line and 4200 ft long along crest; No. 2 dam is concrete gravity structure rising 300 ft above river bed, 2258 ft along crest, and featuring unique hollow design.
Big dam diggings in backwoods
Excavating Engr
Rousseau, A. (Autor:in)
Excavating Engineer ; 57
1963
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
A gateway to the 'backwoods': Aalto and the matter of rooting modernity
Online Contents | 2005
|Evaluation of Rain Hail on São Gonçalo Stream Located in Puiú Sub-Basin in Inhamuns Backwoods
DOAJ | 2014
|