Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rock-fill Cofferdam in soo rapids
Pictorial description of cofferdam built as initial step of 18,500 kva hydroelectric power plant at Sault Ste Marie, Mich; equipment used; biggest charge for blasting was 1200 lb of 60% dynamite in 320 holes; cofferdam required 89,000 cu yd fill material, 148,000 cu yd common excavation and 47,000 cu yd rock excavation.
Rock-fill Cofferdam in soo rapids
Pictorial description of cofferdam built as initial step of 18,500 kva hydroelectric power plant at Sault Ste Marie, Mich; equipment used; biggest charge for blasting was 1200 lb of 60% dynamite in 320 holes; cofferdam required 89,000 cu yd fill material, 148,000 cu yd common excavation and 47,000 cu yd rock excavation.
Rock-fill Cofferdam in soo rapids
Construction Methods
1948
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Big Cofferdam built in turbulent rapids
Engineering Index Backfile | 1948
Engineering Index Backfile | 1909
Earth rock cofferdam and concrete cofferdam connecting structure and construction method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Cofferdam construction method and cofferdam structure
Europäisches Patentamt | 2020
|