Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Utilization of part of 730 m head for generation of 57,300 kva; connection to network at 150 kv; narrow arch dam is 52 m long 14 m high; construction of 14,350-m water tunnels; particulars of power plant and turbines.
Utilization of part of 730 m head for generation of 57,300 kva; connection to network at 150 kv; narrow arch dam is 52 m long 14 m high; construction of 14,350-m water tunnels; particulars of power plant and turbines.
Saint-Martin-Vesubie power plant
L'amenagement de Saint-Martin-Vesubie sur le Vesubie (Alpes-Maritimes)
Morenon, E. (Autor:in)
Construction ; 13
1958
10 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reinforced concrete bridge over the river vesubie
Engineering Index Backfile | 1923
|AMÉNAGEMENT - Reconstruction of the Saint-Martin Canal - Paris Xe
Online Contents | 2003
|- Reconstruction of the Saint-Martin Canal - Paris X^e
British Library Online Contents | 2003
|