Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
They made money on floods
Problems of springtime flooding of cofferdam of New Cumberland dam construction at Stratton, Ohio; low cofferdam construction resulted in savings which surpassed costs caused by flooding and dewatering inconveniences; construction of 1315 ft long 115 ft high high-lift dam comprising 11 bays with electrically operated tainter gates is described; concrete construction by use of 50 ton gantry crane, moving on 5 ft thick concrete slab placed on bed rock.
They made money on floods
Problems of springtime flooding of cofferdam of New Cumberland dam construction at Stratton, Ohio; low cofferdam construction resulted in savings which surpassed costs caused by flooding and dewatering inconveniences; construction of 1315 ft long 115 ft high high-lift dam comprising 11 bays with electrically operated tainter gates is described; concrete construction by use of 50 ton gantry crane, moving on 5 ft thick concrete slab placed on bed rock.
They made money on floods
Construction Methods Equipment
1959
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Storm sewer ends man-made floods
Engineering Index Backfile | 1963
|Torrential floods - Natural and man-made hazard
British Library Conference Proceedings | 1997
|Wooden I-Joists Exposed to Floods, How Do They Perform?
British Library Conference Proceedings | 2018
|Wooden I-Joists Exposed to Floods, How Do They Perform?
ASCE | 2018
|UB Braunschweig | 2017
|