Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of new lock for 100 ft lift through Muscle Shoals dam, Alabama; construction of two water supply culverts required driving of tunnel cuts 19×27 ft through old dam; blasting had to remove dam concrete without disturbing old structure; how work was done for removal of concrete arches and piers; drilling pattern for intake culvert tunnels.
Construction of new lock for 100 ft lift through Muscle Shoals dam, Alabama; construction of two water supply culverts required driving of tunnel cuts 19×27 ft through old dam; blasting had to remove dam concrete without disturbing old structure; how work was done for removal of concrete arches and piers; drilling pattern for intake culvert tunnels.
Delicate blasting on Wilson dam
Explosives Engr
McClinton, J.E. (Autor:in)
Explosives Engineer ; 37
1959
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Blasting through delicate rock
Online Contents | 1993
|British Library Online Contents | 1997
British Library Online Contents | 2018
Wiley | 1998
Wiley | 1995