Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge for growth in Corpus Christi
High level arched cantilever span replaces outmoded drawbridge; anchor spans are 310 ft long and main span 620 ft, providing 140 ft vertical shipping clearance; feature of bridge is that cantilever arms of main span carry 400 ft suspended tied arch; deck is 82 ft wide with two 36 ft roadways, 4 ft median strip and two 3 ft sidewalks; use of box shaped members as chords up to size of 150 sq in.
Bridge for growth in Corpus Christi
High level arched cantilever span replaces outmoded drawbridge; anchor spans are 310 ft long and main span 620 ft, providing 140 ft vertical shipping clearance; feature of bridge is that cantilever arms of main span carry 400 ft suspended tied arch; deck is 82 ft wide with two 36 ft roadways, 4 ft median strip and two 3 ft sidewalks; use of box shaped members as chords up to size of 150 sq in.
Bridge for growth in Corpus Christi
Eng News-Rec
Engineering News-Record ; 162
1959
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Growth problems in Corpus Christi
Engineering Index Backfile | 1938
|Growth problems in Corpus Christi
Engineering Index Backfile | 1938
|Assessment and Rehabilitation of Corpus Christi Harbor Bridge, Texas
British Library Online Contents | 2010
|ASCE | 2016
|Engineering Index Backfile | 1931