Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Post-stressed girders were cast on grade
Design considerations, constructional principles and procedures of $517,800 Montrose Ave grade separation structure on Edens Expressway in Cook County, Ill, whose key design element was post-stressed portland-cement-concrete girder; bridge was built on top of ground and excavation for expressway lanes was final step in construction of structure.
Post-stressed girders were cast on grade
Design considerations, constructional principles and procedures of $517,800 Montrose Ave grade separation structure on Edens Expressway in Cook County, Ill, whose key design element was post-stressed portland-cement-concrete girder; bridge was built on top of ground and excavation for expressway lanes was final step in construction of structure.
Post-stressed girders were cast on grade
Better Roads
Better Roads ; 29
1959
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Pre-stressed 108-ft girders in German bridge
Engineering Index Backfile | 1940
Pre-cast girders go railroading
Engineering Index Backfile | 1964
Performance of Prestressed Girders Cast LWSCC
NTIS | 2012
|Detection of the reinforcement corrosion in pre-stressed concrete girders
Tema Archiv | 2006
|