Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Railway and highway relocation at Noxon Rapids
Relocation from area to be inundated by Noxon Rapids Reservoir affected 20 mi of main line railroad and 10 mi of highway; new railroad bridges with open deck plate girder spans and with one 360 ft through truss span; major new highway bridge replaced existing low level bridge, with superstructure of two parallel continuous five span plate girders spaced 25 ft on transverse centers.
Railway and highway relocation at Noxon Rapids
Relocation from area to be inundated by Noxon Rapids Reservoir affected 20 mi of main line railroad and 10 mi of highway; new railroad bridges with open deck plate girder spans and with one 360 ft through truss span; major new highway bridge replaced existing low level bridge, with superstructure of two parallel continuous five span plate girders spaced 25 ft on transverse centers.
Railway and highway relocation at Noxon Rapids
Civ Eng (NY)
Latham, G.R. (Autor:in) / Saville, W.G. (Autor:in)
1959
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Noxon rapids: power dam rises in Montana
Engineering Index Backfile | 1957
Noxon Rapids Dam Sudden Seepage and Erratic Piezometer Behavior
British Library Conference Proceedings | 2011
|Cabinet Gorge and Noxon Rapids: Electric Power and the Environment
British Library Online Contents | 2000
|Grand Rapids, Grand Haven and Muskegon railway
Engineering Index Backfile | 1902
Tunnel solves highway relocation problem
Engineering Index Backfile | 1934
|