Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Inspection of railway viaduct in Rotterdam
50-year old 2-mi long viaduct of railway from Rotterdam-Hofplein to Hague was constructed as continuous reinforced concrete hollow box girder; viaduct examined thoroughly because of many cracks found in structure; main structure is still in god condition, but new deck slab of prestressed concrete is necessary. (See also - n 33 Aug 15 1958 p Bt 85-89)
Inspection of railway viaduct in Rotterdam
50-year old 2-mi long viaduct of railway from Rotterdam-Hofplein to Hague was constructed as continuous reinforced concrete hollow box girder; viaduct examined thoroughly because of many cracks found in structure; main structure is still in god condition, but new deck slab of prestressed concrete is necessary. (See also - n 33 Aug 15 1958 p Bt 85-89)
Inspection of railway viaduct in Rotterdam
Onderzoekingen aan een spoorwegviaduct te Rotterdam
van Zutphen, J. (Autor:in)
Ingenieur ; 70
1958
6 pages
Aufsatz (Zeitschrift)
Niederländisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reinforced concrete viaduct at Rotterdam
Engineering Index Backfile | 1909
|An armored concrete viaduct at Rotterdam
Engineering Index Backfile | 1910
The reinforced-concrete viaduct of the South Holland electrical railway company at Rotterdam
Engineering Index Backfile | 1907
|Engineering Index Backfile | 1940