Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Earthwork on Rehabilitation Shoreline Improvement in vicinity of Crysler Memorial on St Lawrence, Ont consists of 1,000,000 yd of excavation for new waterway, construction of 3 1/2 mi of embankment, 1200 ft of dike with weir, 2600 ft of causeway, 1000 ft beach and 600-ft dock for pleasure craft; equipment involved.
Earthwork on Rehabilitation Shoreline Improvement in vicinity of Crysler Memorial on St Lawrence, Ont consists of 1,000,000 yd of excavation for new waterway, construction of 3 1/2 mi of embankment, 1200 ft of dike with weir, 2600 ft of causeway, 1000 ft beach and 600-ft dock for pleasure craft; equipment involved.
Seaway shore work is Canadian first
Eng Contract Rec
Kearsley, A. (Autor:in)
1957
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Canadian section of St. Lawrence Seaway
Engineering Index Backfile | 1960
|Canadian Section of the St. Lawrence Seaway
ASCE | 2021
|Engineering Index Backfile | 1958
|Engineering Index Backfile | 1957
Engineering Index Backfile | 1952
|