Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Progress on west Hull and Haltemprice joint main drainage scheme
Humberside pumping station will be capable of dealing with flow of 63, 000 ft of sewage per min at all states of tide, when all of four 30-in. diam dry weather flow and eight 50-in. diam storm water pumps have been installed; work on scheme began in 1950, final section of scheme northern branch trunk sewer, will be completed during 1961.
Progress on west Hull and Haltemprice joint main drainage scheme
Humberside pumping station will be capable of dealing with flow of 63, 000 ft of sewage per min at all states of tide, when all of four 30-in. diam dry weather flow and eight 50-in. diam storm water pumps have been installed; work on scheme began in 1950, final section of scheme northern branch trunk sewer, will be completed during 1961.
Progress on west Hull and Haltemprice joint main drainage scheme
Civ Eng (Lond)
Civil Engineering ; 52
1957
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Inauguration of West Middlesex main drainage scheme
Engineering Index Backfile | 1936
|Main drainage in city of Kingston Upon Hull
Engineering Index Backfile | 1957
Workington main drainage scheme
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1947
|Blackpool main drainage scheme
Engineering Index Backfile | 1940
|