Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of middleton connecting sewer in North Manchester
Problems encountered in construction of shafts and tunnels due to difficult ground conditions; use of compressed air at pressures up to 32 psi to expedite operations; workings ranged from about 4-13 ft diam; particulars concerning tunnel lining, manholes, water seepage, maintenance of air pressure, etc. (See also - discussion p 719-26)
Construction of middleton connecting sewer in North Manchester
Problems encountered in construction of shafts and tunnels due to difficult ground conditions; use of compressed air at pressures up to 32 psi to expedite operations; workings ranged from about 4-13 ft diam; particulars concerning tunnel lining, manholes, water seepage, maintenance of air pressure, etc. (See also - discussion p 719-26)
Construction of middleton connecting sewer in North Manchester
Instn Civ Engrs -- Proc
Collier, E.H. (Autor:in)
1956
19 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Manchester, Mass., outfall sewer
Engineering Index Backfile | 1917
|Engineering Index Backfile | 1927
|