Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Efficient trench bracing speeds pipe laying
Equipment and methods used to maintain placing rate of 18 lengths of 8-ft pipe per 10-hr day at sewer construction in Miami, Fla; operation consists of driving two lines of sheet piles ahead of trench, excavating between, laying pipe, advancing bracing frame, and backfilling.
Efficient trench bracing speeds pipe laying
Equipment and methods used to maintain placing rate of 18 lengths of 8-ft pipe per 10-hr day at sewer construction in Miami, Fla; operation consists of driving two lines of sheet piles ahead of trench, excavating between, laying pipe, advancing bracing frame, and backfilling.
Efficient trench bracing speeds pipe laying
Construction Methods Equipment
1957
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Grout bedding speeds pipe laying
Engineering Index Backfile | 1968