Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction features of four story La Peer Bldg, Los Angeles, Calif; clear span floor construction using 50 ft members without intermediate support; installation of prestressed concrete floor members was completed in three days; in design of floor units approach used was to produce camber sufficient to balance effect of cover slab and anticipated service loads.
Construction features of four story La Peer Bldg, Los Angeles, Calif; clear span floor construction using 50 ft members without intermediate support; installation of prestressed concrete floor members was completed in three days; in design of floor units approach used was to produce camber sufficient to balance effect of cover slab and anticipated service loads.
Steel goes up in 7 days; concrete takes only 3
Western Construction
Hobbs, S. (Autor:in)
Western Construction ; 32
1957
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1963
One monster goes and another takes its place
Online Contents | 2004
|Nevada airport -- $8,000,000 job takes thirty days
Engineering Index Backfile | 1943
British Library Online Contents | 2006
|Concrete technology goes underground
British Library Online Contents | 2001
|