Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete meets all challenges on complex building project
Plant for manufacturing typewriters in Lexington, Ky, covers 290 acres and includes almost every kind of concrete construction; plans for pilot plant called for lift slab roof and precast wall panels; bulk of other buildings largely of precast members; poured-in-place structural concrete was used for 2-story office building and engineering research building.
Concrete meets all challenges on complex building project
Plant for manufacturing typewriters in Lexington, Ky, covers 290 acres and includes almost every kind of concrete construction; plans for pilot plant called for lift slab roof and precast wall panels; bulk of other buildings largely of precast members; poured-in-place structural concrete was used for 2-story office building and engineering research building.
Concrete meets all challenges on complex building project
Construction Methods Equipment
1957
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Emerald Group Publishing | 1998
|Online Contents | 1998
|British Library Online Contents | 1998
|Track machine development meets challenges
British Library Online Contents | 1996
Jordan Meets Water Supply Challenges
Wiley | 1984
|