Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Salto Granade, Brazil
n 11 Nov 1956 p 417-23: Station will have final capacity cf of 100 mw producing 285 million kw-hr per yr; waters of Santo Antonio River diverted to Guanhaes River, where reservoir is established; phases of construction of surge tunnel and diversion dam. n 12 Dec 1956 p 468-72: Hydraulic and electrical equipment; two main units for first stage include vertical Francis turbine having output 34,000 hp at 95 m head and 257 rpm; three phase synchronous generators are rated at 25,000 kw.
Salto Granade, Brazil
n 11 Nov 1956 p 417-23: Station will have final capacity cf of 100 mw producing 285 million kw-hr per yr; waters of Santo Antonio River diverted to Guanhaes River, where reservoir is established; phases of construction of surge tunnel and diversion dam. n 12 Dec 1956 p 468-72: Hydraulic and electrical equipment; two main units for first stage include vertical Francis turbine having output 34,000 hp at 95 m head and 257 rpm; three phase synchronous generators are rated at 25,000 kw.
Salto Granade, Brazil
Water Power
Water Power ; 8
1956
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2003
British Library Online Contents | 1996
Main features of the Salto Pilão hydro scheme in Brazil
Online Contents | 2009
|British Library Online Contents | 2001