Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Overhaul by million yards on Teton park highway job
Construction of 21 mi of new highway in Teton National Park; pavement width will be 24 ft with graded width of 36 ft; finish crown will be 32 ft including 4 ft of stabilized turf shoulder on each side; design of special shoulder treatment.
Overhaul by million yards on Teton park highway job
Construction of 21 mi of new highway in Teton National Park; pavement width will be 24 ft with graded width of 36 ft; finish crown will be 32 ft including 4 ft of stabilized turf shoulder on each side; design of special shoulder treatment.
Overhaul by million yards on Teton park highway job
Pac Bldr Engr
1957
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Million yards concrete for dam
Engineering Index Backfile | 1943