Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Management methods are needed as highway construction programs expand; California has prepared standard progress curve as guide for field control on contractors' progress; study initiated by Construction Department on "Contract Progress Control" involved; job progress control, study to determine feasible time limits and analysis of contract progress and weather nonworking days.
Management methods are needed as highway construction programs expand; California has prepared standard progress curve as guide for field control on contractors' progress; study initiated by Construction Department on "Contract Progress Control" involved; job progress control, study to determine feasible time limits and analysis of contract progress and weather nonworking days.
Applying controls to highway work
Western Construction
Harris, M. (Autor:in)
Western Construction ; 32
1957
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|Exploring the Effectiveness of Variable Speed Limit Controls on Highway Work-Zone Operations
British Library Online Contents | 2004
|Principles Applying to Highway Road-Beds
ASCE | 2021
|Principles applying to highway road-beds
Engineering Index Backfile | 1939
|