Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Description of foundation problems in connection with construction of rolling mill; excavation and underpinning in rebuilding Bank of England; reinforced concrete caisson foundations for large block of grain silos; founding heavy buildings on extremely bad soil such as flour mills which are erected behind dock walls.
Description of foundation problems in connection with construction of rolling mill; excavation and underpinning in rebuilding Bank of England; reinforced concrete caisson foundations for large block of grain silos; founding heavy buildings on extremely bad soil such as flour mills which are erected behind dock walls.
Difficulties encountered and overcome in connection with constructional works
Surveyor
Faber, O. (Autor:in)
1944
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Difficulties encountered owing to presence of water in sewerage workings
Engineering Index Backfile | 1936
|Difficulties encountered in perforation of rock for headrace tunnel of Roselend
Engineering Index Backfile | 1961
|Shaft problems -- How some difficulties have been overcome
Engineering Index Backfile | 1946
|Constructional details of the oberhasli hydroelectric works
Engineering Index Backfile | 1921