Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Nine conveyor belts haul clay from Anderson ranch dam
Conveyor belts 36 in. wide haul impervious clay from borrow pit 1 1/2 mi away; other belts 60 in. wide used to haul pervious material for exteriors of dam from another borrow pit; part of electricity needed for dam's construction is generated by belts and generators also act as brakes to prevent too rapid speeds.
Nine conveyor belts haul clay from Anderson ranch dam
Conveyor belts 36 in. wide haul impervious clay from borrow pit 1 1/2 mi away; other belts 60 in. wide used to haul pervious material for exteriors of dam from another borrow pit; part of electricity needed for dam's construction is generated by belts and generators also act as brakes to prevent too rapid speeds.
Nine conveyor belts haul clay from Anderson ranch dam
Construction Methods
1944
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Anderson ranch dam conveyor system
Engineering Index Backfile | 1944
Engineering Index Backfile | 1943
Engineering Index Backfile | 1945
Engineering Index Backfile | 1944
Anderson Ranch Dam and powerplant
Engineering Index Backfile | 1956