Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of hydroelectric power plant reservoir at Lau-Balagnas plant
Construction of hydroelectric power plant reservoir at Lau-Balagnas plant; province of High Pyrenees, France, 400,000 cu m capacity, formed by highway and other embankments constructed practically all around its perimeter; water side face of embankment, rising to max height of 14 m, is faced with wire-net and gunite revetment; cost 5, 000,000 francs.
Construction of hydroelectric power plant reservoir at Lau-Balagnas plant
Construction of hydroelectric power plant reservoir at Lau-Balagnas plant; province of High Pyrenees, France, 400,000 cu m capacity, formed by highway and other embankments constructed practically all around its perimeter; water side face of embankment, rising to max height of 14 m, is faced with wire-net and gunite revetment; cost 5, 000,000 francs.
Construction of hydroelectric power plant reservoir at Lau-Balagnas plant
Le reservoir d'Arcizans de l'usine hydroelectrique de Lau-Balagnas (H.-Pyrenees)
Lejard, G. (Autor:in)
1933
9 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
AUTOMATIC TIDAL HYDROELECTRIC POWER PLANT WITH WATER RESERVOIR
Europäisches Patentamt | 2020
|Reservoir spillway works of the isollaz hydroelectric power plant
Engineering Index Backfile | 1928
|Construction of Ackersand II hydroelectric power plant
Engineering Index Backfile | 1959
|