Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Blending natural earth deposits for least cost
Materials for granular embankment or base course in highway construction can be obtained by blending natural earth deposits; mathematical theory of linear model programming is used to determine quantities of each available natural earth deposit to be blended so as to produce desired material at least cost; limitations of linear programming.
Blending natural earth deposits for least cost
Materials for granular embankment or base course in highway construction can be obtained by blending natural earth deposits; mathematical theory of linear model programming is used to determine quantities of each available natural earth deposit to be blended so as to produce desired material at least cost; limitations of linear programming.
Blending natural earth deposits for least cost
ASCE -- Proc (J Construction Div)
Ritter, J.B. (Autor:in) / Shaffer, L.R. (Autor:in)
1961
23 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Blending Natural Earth Deposits for Least Cost
ASCE | 2021
|Blending Natural Earth Deposits for Least Cost
ASCE | 2021
|Earth and stone blending equipment for roadbed construction
Europäisches Patentamt | 2024
|Different soil layer damming earth material blending method
Europäisches Patentamt | 2015
|High earth and rockfill dam anti-seepage earth material blending construction method
Europäisches Patentamt | 2022
|