Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Backwater reservoir for dundee corporation waterworks
Description of site investigation and method of construction of earth dam with clay-cement grout cut-off placed by "Manchette " method through vertical perforated tubes having rubber valves; alluvial grouting was commenced from each flank of valley, and in valley bottom embankment was constructed to keep drills above artesian water-levels; sanitary anti-pollution measures.
Backwater reservoir for dundee corporation waterworks
Description of site investigation and method of construction of earth dam with clay-cement grout cut-off placed by "Manchette " method through vertical perforated tubes having rubber valves; alluvial grouting was commenced from each flank of valley, and in valley bottom embankment was constructed to keep drills above artesian water-levels; sanitary anti-pollution measures.
Backwater reservoir for dundee corporation waterworks
Instn Water Engrs -- J
Scrimgeour, J. (Autor:in) / Rocke, G. (Autor:in)
1966
33 pages
Plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Thruscross reservoir of leeds corporation waterworks
Engineering Index Backfile | 1966
Engineering Index Backfile | 1965
|Ryburn waterworks of wakefield corporation
Engineering Index Backfile | 1933
Boughton reservoir of Chester waterworks company
Engineering Index Backfile | 1933