Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Forming job carried out during construction of DeCordova concrete dam in Texas is described; 2320 ft long dam is Ambursen type structure; high ratio of forming and reinforcing steel to concrete was required; pours for slab-and-buttress dam were small and were made with standard panels, bridge pier forms, and tailor-made forming; forms for sloping face and apron slabs are supported by scaffold-type panel shoring; bottom forms are timber; counterforms of steel panels are added as concrete rises.
Forming job carried out during construction of DeCordova concrete dam in Texas is described; 2320 ft long dam is Ambursen type structure; high ratio of forming and reinforcing steel to concrete was required; pours for slab-and-buttress dam were small and were made with standard panels, bridge pier forms, and tailor-made forming; forms for sloping face and apron slabs are supported by scaffold-type panel shoring; bottom forms are timber; counterforms of steel panels are added as concrete rises.
Intricate pours demand complex forming
Construction Methods and Equipment
Smith, M.L. (Autor:in)
1968
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1992
|Taylor & Francis Verlag | 1974
Placement: Record concrete pours - A case study comparison of major concrete raft foundation pours
British Library Online Contents | 1998
|Engineering Index Backfile | 1961
LARGE AREA POURS - Readers' Letters
Online Contents | 2005