Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridgebuilder spans shifty border in nine months
Redevelopment in Chamizal Zone of international border with Mexico at El Paso, Texas, includes 1600 ft concrete bridge, 1200 ft concrete bridge, placing 46,000 ft of new railroad track, two 300 ft steel railroad bridges, and relocation and lining of 9000 ft of Franklin Canal, principal irrigation aqueduct serving this part of Rio Grande Valley; features of dam and canal construction are described.
Bridgebuilder spans shifty border in nine months
Redevelopment in Chamizal Zone of international border with Mexico at El Paso, Texas, includes 1600 ft concrete bridge, 1200 ft concrete bridge, placing 46,000 ft of new railroad track, two 300 ft steel railroad bridges, and relocation and lining of 9000 ft of Franklin Canal, principal irrigation aqueduct serving this part of Rio Grande Valley; features of dam and canal construction are described.
Bridgebuilder spans shifty border in nine months
Construction Method and Equipment
1967
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Elsevier | 1984
|Engineering Index Backfile | 1961
|Convert old fixed spans into vertical lift spans
Engineering Index Backfile | 1934
Elsevier | 1985
|Nine months clyde shipbuilding -- Past work and prospects
Engineering Index Backfile | 1912