Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Substantial service roads speed army base construction
Methods outlined which made possible unusually rapid construction of 180 × 602 ft warehouses which are principal units of depot comprising Quartermaster base; walls and floor are concrete and roofs are timber carried on timber trusses supported on walls and concrete columns; concrete service roads were constructed prior to beginning of work on buildings making delivery of materials and subsequent haulage a major factor in speed of construction.
Substantial service roads speed army base construction
Methods outlined which made possible unusually rapid construction of 180 × 602 ft warehouses which are principal units of depot comprising Quartermaster base; walls and floor are concrete and roofs are timber carried on timber trusses supported on walls and concrete columns; concrete service roads were constructed prior to beginning of work on buildings making delivery of materials and subsequent haulage a major factor in speed of construction.
Substantial service roads speed army base construction
Eng News-Rec
Engineering News-Record ; 128
1942
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Knowledge-base for planning roads construction projects
British Library Conference Proceedings | 1997
|Knowledge-base for planning roads construction projects
British Library Conference Proceedings | 1997
|Barrier-free base construction method for urban roads
Europäisches Patentamt | 2015
|Failures in design, construction and service of roads
British Library Conference Proceedings | 2003
|