Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Possibilities of masonry engineering
Suggestions are given for ten possible improvements in wall construction, namely, (1) 1942, brick wall insulated; (2) 1943, modular brick wall insulated; (3) 1944, add cavity; (4) 1945, add cooling; (5) 1946, add air conditioning; (6) 1947, add panel heating; (7) 1948, add structural clay tile; (8) 1949, add reinforcing; (9) 1950, add prefabrication; and (10) 1951, add solar heating. (See also Am Cer Soc -- Bul v 21 n 7 July 15 1942 p 142-5)
Possibilities of masonry engineering
Suggestions are given for ten possible improvements in wall construction, namely, (1) 1942, brick wall insulated; (2) 1943, modular brick wall insulated; (3) 1944, add cavity; (4) 1945, add cooling; (5) 1946, add air conditioning; (6) 1947, add panel heating; (7) 1948, add structural clay tile; (8) 1949, add reinforcing; (9) 1950, add prefabrication; and (10) 1951, add solar heating. (See also Am Cer Soc -- Bul v 21 n 7 July 15 1942 p 142-5)
Possibilities of masonry engineering
Brick Clay Rec
Heath, Jr., F. (Autor:in)
Brick and Clay Record ; 101
1942
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Possibilities of masonry engineering
Engineering Index Backfile | 1942
|Engineering Index Backfile | 1929
|