Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stage construction plans of Oregon Highway Commission call for ultimate concrete lining of 779 ft; Sunset tunnel now in use with treated fir timber lining supported on concrete sills.
Stage construction plans of Oregon Highway Commission call for ultimate concrete lining of 779 ft; Sunset tunnel now in use with treated fir timber lining supported on concrete sills.
Timber-lined Highway tunnel
Western Construction News
Benedict, A.V. (Autor:in)
1942
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Fire in long, timber-lined tunnel presented tough problems
Engineering Index Backfile | 1944
|Influence of excess fuel from timber lined compartments
Elsevier | 2019
|Concrete-steel-lined pressure tunnel
Engineering Index Backfile | 1951
Concrete-lined tunnel in Scotland
Engineering Index Backfile | 1951