Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High rate dosing of gravel percolating beds
Report of investigation to determine reserve capacity of present bed installation at Leeds sewage works; also to find out effect of high rate dosing on beds. (See also - discussion n 2618 Mar 27 1942 p 109-10, n 2619 Apr 3 p 147-8, n 2620 Apr 10 p 124 and n 2621 Apr 17 p 133)
High rate dosing of gravel percolating beds
Report of investigation to determine reserve capacity of present bed installation at Leeds sewage works; also to find out effect of high rate dosing on beds. (See also - discussion n 2618 Mar 27 1942 p 109-10, n 2619 Apr 3 p 147-8, n 2620 Apr 10 p 124 and n 2621 Apr 17 p 133)
High rate dosing of gravel percolating beds
Surveyor
Thompson, J.T. (Autor:in)
Surveyor ; 101
1942
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Periodicity of dosing percolating filters
Engineering Index Backfile | 1948
|Notes on means of increasing work done by percolating beds
Engineering Index Backfile | 1944
|Notes on means of increasing work done by percolating beds
Engineering Index Backfile | 1944
|COPPER CONCENTRATE AND GRAVEL BEDS
TIBKAT | 2020
|Armored Versus Paved Gravel Beds
ASCE | 2021
|